Commissioning Of The Chiller System

The debugging content of the chiller system includes

 

Under outdoor conditions, the general installation may not be completed exactly in the outdoor design conditions season, so this part of the work must wait for the conditions to be available. Air condition parameters (temperature, humidity) measurement and adjustment of air flow organization in air-conditioned rooms. When the system is basically stable, some representative points can be selected in the room to measure the indoor temperature and humidity. Measurements should be made at intervals during working hours... Measured once an hour. In order to stabilize the air parameters of the air-conditioned room, the room should be kept at no more than/positive pressure. Measurement and adjustment of system noise reduction effect. If there is noise in the room, it is also necessary to use a sound level meter to determine the noise to ensure that the control is within the design requirements. Determination and adjustment of chilled water and cooling water systems. The adjustment of this part should be carried out under the design outdoor conditions together with the wind system, and the total water amount of the adjustment system and the debugging content of the chiller system should be determined, including the water amount of each air treatment equipment.

 

The debugging contents of the smoke control and exhaust system include: ① Adjustment of the action of the smoke exhaust port. Each smoke outlet shall be opened and closed according to the design requirements. Determination and adjustment of exhaust air volume. The debugging content of the chiller system includes: adjustment of the action of the air supply port. Each air supply outlet shall be opened and closed according to the design requirements. ③ Measurement and adjustment of air supply volume. ④ Positive pressure measurement and adjustment. Adjust the overpressure exhaust equipment and system valves so that the indoor positive pressure meets the relevant regulations of fire protection and design. ⑤ Review whether the debugging instruments and tools meet the requirements of debugging. The debugging instruments should be complete, the performance should meet the test requirements, and the debugging tools needed for debugging should be made or purchased according to the needs. The main instruments and tools for debugging are: ① dry and wet bulb thermometer. ② Anemometer. ③ Differential pressure gauge. ④ Orifice plate flowmeter. ⑤ Rectifier grid. ⑥ Whether the arrangement of the sound level meter time meets the requirements of the schedule and the requirements of the debugging procedure.

Send Inquiry

whatsapp

Phone

E-mail

Inquiry